thru tubing systems

News

Tubing Packers: Proven Isolation Without Pulling Tubing

Posted on August 24, 2026

With more than 5,000 tubing packers set and retrieved worldwide, Thru Tubing Systems (TTS) is a recognized leader in thru-tubing isolation and completion technology. Designed for tubing sizes from 2-3/8 in. through 7-5/8 in., TTS tubing packers are engineered to be deployed through existing production tubing and designed to drift through nipple profiles and safety… Read more »


Plug & Abandonment Campaign in the Gulf of America

Posted on July 15, 2026

Thru-Tubing Systems Successfully Completes Deepwater Plug & Abandonment Campaign in the Gulf of America Thru-Tubing Systems (TTS) is proud to announce the successful completion of a three-well deepwater Plug & Abandonment (P&A) campaign in the Gulf of America, delivering a 100% success rate with zero contractor non-productive time (NPT). During the campaign, the TTS team… Read more »


Test Validation & Manufacturing Quality Comparison

Posted on June 22, 2026

Does your plug vendor really matter?   Are all plugs the same?  Is it possible to ensure consistency every time you have a job to do? Talking about quality is much easier than taking actions necessary to guarantee it. TTS believes product quality should not be left to chance.  Companies that trust TTS for their… Read more »


Offshore P&A Operation with Adaptive Plug Solution

Posted on June 22, 2026

Thru Tubing Systems (TTS) was contracted to support the plug and abandonment (P&A) of multiple wells on an offshore platform in the Gulf of America. As part of the well program, TTS mobilized the required thru-tubing plugs, casing plugs, and retainers to facilitate safe and efficient abandonment operations. During the intervention, the operator encountered an… Read more »


Plug & Abandonment Done Right

Posted on June 12, 2026

Operators trust TTS for critical Plug & Abandonment work. With proven expertise, precision execution, and a commitment to the highest industry standards, TTS delivers abandonment solutions designed to perform for the long haul. Plug & Abandonment isn’t just the final step — it’s a long-term commitment to well integrity, environmental protection, operational safety, and regulatory… Read more »


Meet the TTS Series 5003 Hydraulic Setting Tool (HST)

Posted on April 29, 2026

The Thru-Tubing Systems (TTS) Series 5003 Hydraulic Setting Tool is engineered for versatility, efficiency, and reliability in demanding well conditions. Designed for multiple setting configurations, the HST enables operators to set tools and pump fluid or cement in a single trip—reducing rig time and improving operational efficiency. Its unique design integrates closing sleeves into the… Read more »


Thru-Tubing Systems Welcomes Clyde Holt as Consultant

Posted on April 1, 2026

Thru-Tubing Systems (TTS) is pleased to announce Clyde Holt as a Consultant to the company. Clyde brings over 55 years of experience in the oilfield industry, with a career spanning offshore Louisiana, Texas, Wyoming, Montana, and beyond. He spent 25 years at Weatherford International, including 15 years as Global Supply Chain and Manufacturing Manager, overseeing… Read more »


Kyle Jamieson named Regional Sales Director for Europe & Africa

Posted on March 24, 2026

Thru-Tubing Systems (TTS) is excited to announce that Kyle Jamieson has joined the company as Regional Sales Director for Europe & West Africa. Based in the UK, Kyle brings over 20 years of international experience in well intervention and completions, having held leadership roles at leading O&G service companies including Welltec and TCO, with extensive… Read more »


2026 Wireline Industry Mixer Sponsor

Posted on March 11, 2026

Thru Tubing Systems is proud to be a Super Sponsor of the 2026 Wireline Industry Mixer in Houston, TX. Interested in attending? Reach out to your TTS rep for more info.


Offshore Success: Complex Tubing Patch Execution in the Gulf of America

Posted on February 27, 2026

Thru Tubing Systems recently partnered with a major operator in the Gulf of America to execute a complex offshore tubing patch operation involving diagnostics, fishing, and long-interval straddle re-deployment. The objective: Identify additional leaks, retrieve legacy packers set in 2013, and re-install a fully tested straddle assembly using TTS 3-1/2″ Paragon II Packers — safely… Read more »


Translate