thru tubing systems

Category: News

From 231 to 3,402 BOPD: A Rigless Success Story

Posted on November 5, 2025

Kuwait’s Burgan Field—one of the largest oilfields in the world—has long struggled with high water cuts, reaching as much as 94% in some wells. Traditional rig-based interventions were costly and slow, limiting production recovery. TTS delivered a game-changing solution: a rigless intervention that reversed the trend. Using our Thru-Tubing Vented Umbrella Plug with precision cement… Read more »


A Message from Our President

Posted on October 13, 2025

From: Danny Teen Subject: Strategic Alliance Thru-Tubing Systems, Inc (TTS) is pleased to announce a strategic alliance with Gradwell Oilfield Pvt. Limited for the following products: Completion Packers & Accessories Retrievable Bridge Plugs Cast Iron Bridge Plugs & Retainers These products complete the TTS product line that includes: Thru Tubing Sand Control Permanent Thru Tubing… Read more »


Strategic Partnership Announcement

Posted on October 7, 2025

We are pleased to announce that Gradwell Oilfield Pvt. Ltd. (India) has entered into a Master Supply & Strategic Agreement with Thru-Tubing Systems (TTS), marking a major step forward in our global collaboration. Under this agreement, TTS is appointed as the Authorized Reseller for Gradwell products across key international markets for Downhole Completion, Production, and Cementing products including specialized high-end engineering… Read more »


Join us at this year’s Wireline Industry Mixer

Posted on April 15, 2025

Join us at this year’s Wireline Industry Mixer in Houston, TX on May 6, 2025. Visit our booth for a chance to win a 4-night stay at The Wharf in Orange Beach, AL. Click here to learn more and register for event.


TTS 4-1/2″ Retrievable Bridge Plug stops high-rate downward flow

Posted on October 2, 2024

An operator in Vietnam faced a critical challenge when a tubing leak caused a down flow of 6,000 barrels per day (bpd) of water. To address this, the TTS Team evaluated the well parameters and recommended a targeted solution using a Paragon II Packer configuration. This innovative setup aimed to stop the water flow, allowing… Read more »


TTS Non-Explosive Electro-Hydraulic Bailer Bottom puts well back in production

Posted on August 16, 2024

Thru-Tubing Systems was contacted by a major deep-water operator in the Gulf of Mexico inquiring about a solution for dump-bailing glycol with non-explosive bailers to remedy a non-producing well. Using our Non-Explosive Electro-Hydraulic Bailer Bottom, we successfully made thirty-six bailer runs with a single tool without any misruns. In conjunction with a wireline company, TTS… Read more »


Join us at this year’s Wireline Industry Mixer

Posted on April 12, 2024

Join us at this year’s Wireline Industry Mixer in Houston, TX on May 7. Visit our booth for a chance to win a 4-night stay at The Wharf in Orange Beach, AL. Click here to learn more and register for event.


TTS Vented Umbrella Basket Remedies Years Long P&A Attempts

Posted on August 15, 2023

Thru-Tubing Systems was contacted after client had many failed P&A attempts over several years. A well that was drilled in 1992 and had liner leaking at 22,000’. While attempting to find the leak, the well had a blowout and fishing operations commenced to remove Champ packer at 19,226’.  While attempting to fish packer, the rig… Read more »


TTS Gas Lift Straddle Packer Helps Set New Record in Gulf of Mexico

Posted on August 15, 2023

Thru-Tubing systems was instrumental in the successful completion of a significant project for a deep-water well. This remarkable endeavor involved retrofitting a gas lift system, including the installation of a straddle packer assembly to isolate a thru-tubing gas lift valve. Setting a new record, this retrofit was executed at a remarkable depth of 19,800ft. The… Read more »


TTS Develops 2.5” High Expansion Packer

Posted on August 15, 2023

Thru-Tubing Systems instrumental in helping Helix Energy Solutions set a new deepest deployment record for the Helix 10K Intervention Riser System (IRS) on a deepwater well. The Q4000 performed a flow back on an unnamed well at a water depth of 2,851 meters. The Q4000 completed the flow back successfully, also performing a Thru-Tubing screen… Read more »


Translate