|

TTS
Thru-Tubing
Gas Lift / Velocity String Installation
(Utilizing the TTS Retrievable Thru-Tubing Packer System)
Features/Benefits
-
Designed for applications when desirable to deepen the Gas Lift injection
point without pulling the production tubing, allowing for Gas Lift
repair or installation using coil tubing and/or wireline without the
expense of a rig.
-
Live well operations can easily be tolerated, eliminating the need
and expense of well killing programs.
-
Each packer can be tested along with all connections of coil tubing
as they are run, allowing for removal and replacement prior to attempting
to flow the well.

Click
on image to see larger view
TTS
Thru-Tubing
Gas Lift / Velocity String Installation
 |
PDF
file for a printer friendly version
of this page |
| |
If
Acrobat Reader is not loaded on your computer - please download
it FREE at www.adobe.com |
 |
Workover/Completion
Systems Section |

THRU-TUBING
SYSTEMS, INC.
4102 Hwy 90 West, New Iberia LA, 70560
Phone: 337.606.0032 | Fax:337.606.0039
E-Mail:
tts@thrutubingsystems.com
ABOUT TTS | TTS
PRODUCTS | SAND CONTROL SYSTEMS
|
WORKOVER/COMPLETION SYSTEMS | CASED
HOLE SYSTEMS (X-SPAN) |
SITE
MAP | HOME
|