|

TTS
Thru-Tubing Wash Down Gravel Pack
Features/Benefits
- Can be deployed
on coil tubing in one trip. Does not require subsequent trips into
the well to install pack-offs or tubing stops.
- Can accommodate
production-tubing movement. Conventional thru-tubing wash down assemblies
using pack-offs and tubing stops are subject to failure under conditions
where production tubing movement is prevalent.
- Able to test sealing
and anchoring components while installing. Unlike conventional thru-tubing
wash down systems, sealing and anchoring component failures can be detected
and repaired prior to producing the well.
- Available for
tubing sizes from 2-3/8” – 4-1/2”.

Click
on image to see larger view
Sand
Control Systems:
TTS
Thru-Tubing
Wash Down Gravel Pack
 |
|
| PDF
file for a printer friendly version of this page |
If
Acrobat Reader is not loaded on your computer - please download
it FREE at www.adobe.com |
 |
Sand
Control Systems Section |

THRU-TUBING
SYSTEMS, INC.
4102 Hwy 90 West, New Iberia LA, 70560
Phone: 337.606.0032 | Fax:337.606.0039
E-Mail:
tts@thrutubingsystems.com
ABOUT TTS | TTS
PRODUCTS | SAND CONTROL SYSTEMS
|
WORKOVER/COMPLETION SYSTEMS | CASED
HOLE SYSTEMS (X-SPAN) |
SITE
MAP | HOME
|