|

TTS
Thru-Tubing
Gravel Pack Screen Hang-Off
Features/Benefits
- Features a variety
of deployment vehicles. Can be deployed on coil tubing, electric
line, or slickline in one trip.
- Can be deployed
on wireline or slickline and gravel packed at a later date utilizing
coil tubing and a Crossover Tool with an addition of a Perforated Extension
and Closing Sleeve run below the packer. Allows accuracy for applications
that require critical depth measurements.
- Available for
tubing sizes from 2-3/8 to 4-1/2". Most popular sizes are routinely
stocked for customer convenience.
- Can be retrieved
with coil tubing or slickline in one trip with standard wireline or
coil tubing fishing tools. Allows for replacement and repair of
failed components

Click
on image to see larger view
Sand
Control Systems:
TTS
Thru-Tubing
Gravel Pack Screen Hangoff
 |
|
| PDF
file for a printer friendly version of this page |
If
Acrobat Reader is not loaded on your computer - please download
it FREE at www.adobe.com |
 |
Sand
Control Systems Section |

THRU-TUBING
SYSTEMS, INC.
4102 Hwy 90 West, New Iberia LA, 70560
Phone: 337.606.0032 | Fax:337.606.0039
E-Mail:
tts@thrutubingsystems.com
ABOUT TTS | TTS
PRODUCTS | SAND CONTROL SYSTEMS
|
WORKOVER/COMPLETION SYSTEMS | CASED
HOLE SYSTEMS (X-SPAN) |
SITE
MAP | HOME
|